| S.No | Last Date/Time of Submission | Last Date & Time of Sales/Download of Documents | Name Of Work | Tender Notice | Tender Status |
|
1
| 22/02/2012 3:00PM | 20/02/2012 5:45PM | Taking up Surveying, leveling operations and preparation of tree map, Alignment plan, LS Plan, Auto CAD Drawing and marking Temporary Bench Mark work for 1700 KMs of providing combined water supply scheme to 1751 habitations in Pudukkottai
part II, Viralimalai, Annavasal,Kunnandarkoil part II , Aranthangi, Karambakudi and Thiruvarankulam Unions in Pudukkottai District. Surveying and leveling works are to be taken up to 1 Aranthangi,2 Karambakudi and 3 Thiruvarankulam Unions.
| No. 6 F.CWSS to 1751 habs. PDK Survey JDO1 2011 dt. 27.01.2012 | Status |
|
2
| 20/02/2012 3:00PM | 17/02/2012 5:45PM | Supply, Delivery Laying and Jointing of PSC Pipes for the realignment of existing pumping main due to construction of ROB at LC No. 309 Budhalur in CWSS TO 706 HABITATIONS IN PUDUKKOTTAI DISTRICT Deposit work | No 110 F. 706 CWSS ROB Budhalur jdo 1 2012dt 27.1.12 | Status |
|
3
| 16/02/2012 3:00PM | 15/02/2012 5:45PM | Providing additional Infrastructures Panchayat sump at Singaperumal Koil under CWSS to Nandhivaram Guduvancheri in Kancheepuram District Construction of 2.20 lakh litres Ground level sump, construction of pump room, supply, delivery and erection of 20.00 HP submersible pump sets, connecting main and pumping main, and contractor maintenance for 3 months at free of cost under Revamping works | EEMDMMN141 | Status |
|
4
| 16/02/2012 3:00PM | 15/02/2012 5:45PM | Replacement of pipe line, fixing of new Air valves and replacement of old Air valves to CWSS to Melmaruvathur Acharapakkam in Kancheepuram District and including contractor maintenance for 3 months at free of cost under Revamping work | EEMDMMN142 | Status |
|
5
| 16/02/2012 3:00PM | 15/02/2012 5:45PM | CWSS to Ozhalur and 7 other habitations in Kattankolathur Union of Kancheepuram District Supply, Delivery, laying, Jointing and testing of 100mm CI LA Class pipes for connecting main with anchorage arrangement and 150mm DI Pipes for pumping main and providing thrust blocks etc complete including contractor maintenance for 3 months at free of cost. | EEMDMMN143 | Status |
|
6
| 16/02/2012 3:00PM | 14/02/2012 5:45PM | Providing Under Ground Sewerage Scheme To CENTRAL ELECTRO CHEMICAL REASERCH INSTITUTE CECRI at Karaikudi in Sivagangai District including maintenance of the scheme for 12 months under Deposit work | F CECRI UGSS SDO 2 C A 2011 Dt 25 01 2012 | Status |
|
7
| 15/02/2012 3:00PM | 14/02/2012 5:45PM | Providing CWSS to Kadaperi and 7 other quality affected habitations in Walaja union Construction of pumproom Supply and delivery and erection of pumpsetS Laying and Jointing of pumping main and branch pumping Main Supply and delivery and fixing of flow control valve water meter and rejuvenation of existing OHTs, inlet arrangements for existing OHTs and maintenance of scheme for three months on completion of works.
| SEVLR02 | Status |
|
8
| 10/02/2012 3:00PM | 09/02/2012 5:45PM | Providing UGSS to Udumalpet Municipality in Tiruppur District Supply delivery laying and jointing of sewer line for Zone I II Pumping main House Service Connection One Lifting Station Construction of Sewage Treatment Plant adopting Activated Sludge Process Technology for 7 81 mld including construction of Office cum Lab and Compound Wall Supply delivery erection of Pumpsets and sewer cleaning equipments etc including commissioning and maintenance for a period of one year | F Udumalpet UGSS T3 CE CBE 2011 Dt 27th December 2011 | Status |
|
9
| 09/02/2012 3:00PM | 08/02/2012 5:45PM | CWSS to CLPRA with Pillur Reservoir as source Strengthening of Clear Water Transmission main by replacing of 1500mm PSC pipes with 1500mm MS Pipe from LS 18000m to 19880m 1880 M Phase V including manufacturing supply delivery laying testing of MS pipes and specials etc complete including commissioning and maintenance of scheme for one year | F PHASE V DO T1 CE CBE DATED 09 01 2012 | Status |
|
10
| 09/02/2012 3:00PM | 08/02/2012 5:45PM | CWSS to CLPRA with Pillur Reservoir as source. Replacement of pipeline in RTP 23 Pumping Main from 0m to 7040m and 9240m to 11340m replacing of 250mm AC pipe with 250mm DI pipe including supply delivery laying testing of DI pipes and specials etc complete including commissioning and maintenance of scheme for one year | F RTP 23 DO T1 CE CBE DATED 09 01 2012 | Status |
|
11
| 09/02/2012 3:00PM | 07/02/2012 5:45PM | UPPILIYAPURAM TP IN TRICHY DISTRICT | CTN No 2392 F. UPPI METTI JDO2 2012 DT.20.01.12 | Status |
|
12
| 09/02/2012 3:00PM | 07/02/2012 5:45PM | MEETUPALAYAM IN TRICHY DISTRICT | CTN NO 2392 F MEETU JDO 2 2012 DT 20.01.12 | Status |
|
13
| 09/02/2012 3:00PM | 08/02/2012 5:45PM | Providing Pumping Main For Disposal Of 12.25 MLD Treated Effluent From STP To Disposal Point At Gadilam River And Allied Works for Underground Sewerage Scheme in Cuddalore Municipality | CEVLR07 | Status |
|
14
| 08/02/2012 3:00PM | 07/02/2012 5:45PM | Providing CWSS to 40 Rural habitations in Chengam and Pudupalayam Unions in Thiruvannamalai District from the Bulk supply of water provided under CWSIS to Chengam and Pudupalayam Town Panchayats. Constructions of various capacity sumps, Pump rooms, Open Wells, Pumpsets pumping main and fencing around pumping stations under turnkey percentage system including maintenance of the scheme for 12 months | SEVLR01 | Status |
|
15
| 03/02/2012 3:00PM | 01/02/2012 5:45PM | Sivagangai District Providing water supply to Ilayankudi Town Panchayat from Ramnad CWSS under Deposit work Construction of
4 LL RCC elevated service reservoir including maintenance for 3 Months | IFB No 1 F ILY TP JDO PD SVG 2012 dt 10 01 12 | Status |
|
16
| 30/01/2012 3:00PM | 27/01/2012 5:45PM | Construction of Check dam at Local odai near Mottayagoundanpatti village of Vembarpatti Panchayat in Shanarpatti union and allied works under NRDWP 2011 12 Programme | SHORT CHIT TENDER NOTICE NO 20 JDO3 F TENDER 2011 2012 DATED 12012012 | Status |
|
17
| 30/01/2012 3:00PM | 27/01/2012 5:45PM | Construction of Check dam at Local odai near Mottayagoundanpatti village of Vembarpatti Panchayat in Shanarpatti union and allied works under NRDWP 2011 12 Programme | SCTN No 20 JDO3F Tender 2011 12 dt 12112 | Status |
|
18
| 30/01/2012 3:00PM | 27/01/2012 5:45PM | Dindigul District CWSS to Silukkuvarpatty Creation of Addituional source of Infiltration wells and allied works including maintenance of the scheme for a period of 12 months | IFB No 2115 DO II Fsilukkuvarpatty cwss 2011 dated 05012012 | Status |
|
19
| 22/12/2011 3:09PM | 21/12/2011 5:45PM | Supply and delivery of Computer consumables as per specifications given by TWAD Board for Head Office Chennai 600 005 on Annual Rate contract basis for one year | CTN NO F 1816 EDPM 2011 | Status |
|
20
| 22/12/2011 3:09PM | 20/12/2011 5:45PM | construction of 4 lakh lit service reservoir at government hospital campus at kulasekaram under cwss to verkilambi town panchayat 6 other town panchayats and 26 way side habitations in kanyakumari district | CTN NO 20 F VERKILAMBI 4 LAKH LITRE S R JDO1 2011 DATE 14 11 2011 | Status |
|