CWSS TO 1153 HABITATIONS IN 9 UNIONS AND PERAVURANI , PERUMAGALUR AND ADIRAMAPATTINAM TOWN PANCHAYATS IN THANJAVUR DISTRICT WITH KOLLIDAM RIVER AS SOURCE
 
Designed Quantity : 38.11 MLD            Project Cost : Rs 495.70 Crores
           Technical Sanction : Rs.490.125 Crores

 PREFATORY

Thanjavur  District comprises of 08 Taluks, 14 Panchayat unions, 22 Town panchayats and 3 Municipalities.

Out of  14 panchayat unions,   204 habitations in Bhudalur union are fully covered with river source.   In the unions Thirupananthal, Thiruvidaimarudur, Kumbakonam, Papanasam, Thiruvaiyaru and in Thanjavur, the habitations are partly covered by the river sources.

This project area comprises of 1003 rural habitations in Pattukottai, Peravurani,  Sethubavachatram, and Madukkur unions  and  wayside 150 Habitations in Papanasam, Thiruvaiyaru, Thanjavur, Orathanadu and Thiruvonam unions and also   three town panchayats namely   Peravurani town panchayat, Perumagalur Town Panchayat  and Adhirampattinam town Panchayat.

 Present Water supply Scenario

At present protected water supply is being provided to all 1153 rural habitations with IPP schemes, EPL and Mini power pump schemes with local sources

 NECESSARY FOR THE PROPOSAL

The trend of the water level   in the project area reveals the depletion of water level over long term.  This trend may cause the reduction in the available yield in future.   Further   , the clear   potable category for the water samples collected in the   area is also less

Hence it is necessary to formulate a CWSS to the above 1153 rural habitations with river source to provide sustainable quantity and quality of water free from Chemical impurities.

In addition, based on the Announcement made, the hamlets of the  Peravurani Town Panchayat, Perumagalur  Town Panchayat  and Adhirampattinam  Town Panchayat are included in the  scope of  this project.

 Project Beneficiaries

Sl.No.

Unions

No. of habitations

1

Pattukottai

300

2

Madukkur

203

3

Sethubavachatram

253

4

Peravurani

247

 

Total

1003

 

WAY SIDE HABITATIONS

 

1

Papanasam

10

2

Thiruvaiyaru

29

3

Thanjavur

38

4

Orathanadu

60

5

Thiruvonam

13

 

Total

150

 

TOWN PANCHAYATS

 

1

Peravurani TP

 

2

Adhirampattinam TP

 

3

Perumagallur  TP

 

 

Total

 

 

GRAND TOTAL

1153

 Population and requirement

The present population projected to 5.82 lakhs , 6.39 lakhs and 6.99 lakhs for the present  (2015), Intermediate(2030), Ultimate (2045 )stages respectively

Demand calculated at 55 lpcd for rural habitations

The net requirement works out to, for   intermediate (2030), Ultimate (2045 ) stages are 34.31 mld and 38.11 mld respectively.  Transmission loss 10% adopted .18 hours of pumping has been adopted in head works and tapping sumps and 12 hours for group sumps

 Brief Description of the proposal

It is proposed to collect the water from 3 collector wells located at Semmangudi , Anaikudi , Veeramangudi in river Kollidam and         will be pumped to common collection sump at Veeramangudi of capacity 21.20 LL (16.20 LL sump+5.00LL Sump cum Pump House) From this Collection Sump, water will be pumped to Karambiyam Booster Station. On the way water is tapped to two Tapping Sumps namely Soorakottai Tapping Sump and Pudhur Tapping Sump to feed totally 150 wayside Habitations and one Group sump to cover  13 Habitations.

From Karambiyam Booster Station water will be pumped in three directions   to Vandakottai , kalanivasal, Paingal group  sumps through 134.82 km transmission main and along the way the water is conveyed to 136 Ground level sumps.

The water collected in 136 ground level sumps is pumped through feedermain of length  1151 km to 1291 existing service reservoirs in  1153 rural habitations and 3 town panchayats and  proposed to distribute  through existing distribution system of length 865.32 km .

 COST

Administrative sanction accorded in G.O. Ms. No : 158  Dt.19.10.2013.

At a cost of Rs.495.70 crore to install and Rs.9.19 crore to maintain annually

 Funding

NRDWP fund , MNP and ULB contribution

  PRESENT STAGE

Work completed and the Scheme was inaugurated by the Hon'ble Chief Minister of Tamil Nadu on 29.11.2017. At present the Scheme is under Contractor Maintenance (M/s. The Indian Hume Pipe., Ltd, Mumbai).

  Salient Details      Open